in the current st Guide for road nstruction. The responsibility for the accuracy of temporary road st estimates rests with the Forest Engineer (FSM 7721.04c). Following the st Estimate Template for Temporary Roads at the end of this Section is a sample form for documenting temporary road sts estimates.